男女无遮挡羞羞视频免费网站

<delect id="f5t7h"></delect>
<b id="f5t7h"></b>
<thead id="f5t7h"><tt id="f5t7h"><tr id="f5t7h"></tr></tt></thead>
<font id="f5t7h"><ol id="f5t7h"></ol></font>
      <nobr id="f5t7h"><tt id="f5t7h"><p id="f5t7h"></p></tt></nobr><delect id="f5t7h"><rp id="f5t7h"><big id="f5t7h"></big></rp></delect>

          <object id="f5t7h"><rp id="f5t7h"></rp></object>

          <samp id="f5t7h"><del id="f5t7h"></del></samp>

          Bridge TMD - Millennium Bridge, London / UK



          Millennium Bridge, London
          Vertical TMD installation
          Horizontal TMD during installation and adjustment
          Horizontal TMD during installation and adjustment
          Vertical TMD installed below the bridge
          Vertical TMD installed below the bridge
          Millennium Bridge, London
          Project
          Millennium Bridge, London
           
             
          Consultant
          Ove Arup & Partners, London
           
             
          Technical Data:
          50 Vertical TMD
          Weight:
          1000 - 2000 kg
          Frequency:
          1,2 - 2,2 Hz
          8 Horizontal TMD
          Weight: 2500 kg
          Frequency: 0,45 Hz
           
             
          Execution
          2001
           
          男女无遮挡羞羞视频免费网站