New Turbines at Rohrbach-Zement GmbH & Co. KG - Germany
Project Rohrbach-Zement GmbH & Co. KG 72359 Dotternhausen, Germany www.rohrbach-zement.de |
Project execution Each 1 turbine in I/ 2000 und I/2001, approx. 100m3 concrete to be removed and built again. Construction time for every foundation approx. 8 weeks |
Design DIETZ & Partner Ingenieur- gesellschaft mbH, Essen |
Scope of supply 12 GERB spring elements (prestressable) for each turbine table |
Measure Rohrbach-Zement decided to increase the cement production. The existing 3 steam turbine did not have sufficient capacity to process the steam supplied from the oil shale processing. Therefore it was decided to replace 2 of the the exisiting 3 steam turbines by new steam turbines with higher output. Steam turbines - dismantled : ea 1 x 14t/h (built 1961 + 1980) Steam turbines - new : 2 X 28 t/h (7,77 MW) |
|
Turbine manufacturer B+V Industrietechnik GmbH, Hamburg |