          Reconstruction of turbine foundation No. 3 & 5 at Neumünster Municipal PP



          Turbine No.3 - Neumünster MPP
          Original situation - settlements of approx. 6 cm
          Original situation - settlements of approx. 6 cm
          Diamond rope saw used to cut the columns
          Removal of the previously cut concrete slab
          Turbine table supported on steel columns, concrete block cut out of the column
          Alignment of spring elements
          Spring elements released, turbine table back into the original position
          Turbine No.3 - Neumünster MPP
          Project
          Renovation of turbine foundation No. 3 & 5 at Neumünster Municipal Power Plant
          Scope of supply
          16 prestressable GERB spring elements, type GP
             
          Owner
          Neumünster Municipal Power Plant, Germany
          Project execution
          Turbine No. 3 in 2003
          Turbine No. 5 in 2004
             
          Problem
          The foundation of Turbine No. 3 with a capacity of 25 MW had settled over the years by about 6 cm, although quite equally.
           
             
          Measures taken
          As a first step blocks of concrete corresponding to the height of the spring elements had to be cut out of each of the 6 columns to provide space for the installation of the spring elements. GERB organized a procedure to cut up to 38 cm high blocks out of the 1.2 x 1.2 m wide columns based on the use of a diamond rope saw. Only then it was possible to install spring elements in the structure of the originally rigid table type turbine foundation. Thereafter it was possible to realign the spring-supported system in an easy way on spring level. Later-on the same levelling procedure can be used at any time again and again as far as ever necessary.
           